ECG ENGINEERING: PROJECTS
Ramapo School District, NY

Project Size: $9.4 Million
Cash Flow: $2.2 Million
Total Value: $ 11.6 Million
Completed: November 2012
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $430,000
Reduction in Energy Costs: 27%

.................................................

Project Description
Having seen many of their neighboring Districts enjoy the benefits of Energy Performance Contracting, administrators at the Ramapo CSD decided to retain ECG to initiate an energy project in November 2009.

Project Highlights

  • lighting system upgrades
  • occupancy sensors
  • energy management system upgrades
  • high efficiency/variable frequency drives
  • demand control ventilation (DCV)
  • weatherization
  • boiler, burner, heat exchange replacement
  • air handler refurbishment/replacement
  • steam trap repair
  • insulate steam pipe/valves
  • destratification fans
  • ceiling replacement
  • transformer replacement
  • door/vestibule replacement
  • kitchen hood exhaust controls
  • boiler controllers
  • walk-in freezer controllers
  • photovoltaic (solar) panels
  • wind turbine
  • swimming pool cover
  • distribution pumps
Back to Portfolio Page